العربية
  • Free & Easy Returns
  • Best Deals
العربية
loader
Wishlist
wishlist
Cart
cart

25 Meter HDMI Cable V1.4 by True High Quality HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated

Sorry! This product is not available.
1
Available Soon
Overview
Highlights
  • High speed digital video and audio cable for the sharpest picture, deepest color, and highest resolution sound
  • Ultimate picture and sound from larger hdtvs and high definition av sources
  • 1.4 VERSION cable Transmits high-definition video from your computer to a monitor for video streaming; Connect and configure your monitor for an Extended Desktop or Mirrored Displays
Specifications
Product Weight1200 g
Colour NameBlack
What's In The Box25 Meter HDMI Cable
Product Length10 in
Product Height10 in
Product Width/Depth10 in
Model NumberHDMI25M
Model NameHDMI25M
Item Quantity1

25 Meter HDMI Cable V1.4 by True High Quality HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated

Added to cartatc
Cart Total EGP 0.00
Loading